r4 - 13 Mar 2007 - 08:39:04 - AndyLawrenceYou are here: TWiki >  VOTech Web  >  InfraStructure > InfrastructureDesignStudyReport

DS3 Study Report

The DS3 Study Report will document how the EuroVO will be implemented based on the results of this and the other design studies. As a result, we will produce this report in two instances:

Interim report

The interim report, produced in January 2007, is available as a PDF document here.

The first draft of the interim report, April 2006, was developed in this wiki and can be seen at InfrastructureDesignStudyReportDraft01.

Final report

We will deliver the definitive report by the end of the project (Dec 2008).

Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r4 < r3 < r2 < r1 | More topic actions
 
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback