Materials for Formal Review

The "mid term review" is being held in Edinburgh on Oct 8th, as part of the StageSixPlanningMeetings. Here we collect some key documents to assist the review.

Meeting Agenda

Key Documents

Deliverables

Material prepared in advance of meeting

Presentations given at Review Meeting

-- AndyLawrence - 18 Sep 2007

Topic attachments
I Attachment Action Size Date Who Comment
pdfpdf DS3PreliminaryStudyReport.pdf manage 69.3 K 2007-09-18 - 20:21 AndyLawrence Infrastructure (DS3) Preliminary Study Report
pdfpdf DS4PreliminaryStudyReport.pdf manage 3742.1 K 2007-09-18 - 20:24 AndyLawrence Tools (DS4) Preliminary Study Report
pdfpdf DS6PreliminaryStudyReport.pdf manage 5825.4 K 2007-09-18 - 20:28 AndyLawrence Data Exploration (DS6) Preliminary Study Report
docdoc VOTECH-PP-I-contract-dw.doc manage 358.0 K 2007-09-18 - 20:19 AndyLawrence Contract Description of Work (word doc)
pdfpdf VOTECH-PP-revisions-2006-dec.pdf manage 86.9 K 2007-09-18 - 20:21 AndyLawrence Project Plan Revisions December 2006
docdoc VOTECH-PP.doc manage 286.0 K 2007-09-18 - 20:20 AndyLawrence Project Plan March 2005
pdfpdf VOTECH-Review-Agenda.pdf manage 137.6 K 2007-09-19 - 21:57 AndyLawrence Review Agenda
pdfpdf sfd-v0.6.pdf manage 957.3 K 2007-09-18 - 21:43 AndyLawrence Draft 0.6 of Science Framework Document
pdfpdf votech-1st-annual-report.pdf manage 239.9 K 2007-09-18 - 20:32 AndyLawrence First Annual Report
docdoc votech-2nd-annual-report-partA.doc manage 336.0 K 2007-09-18 - 21:27 AndyLawrence Second Annual Report
Topic revision: r11 - 2007-10-11 - 15:14:14 - AndyLawrence
 
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback